S/N

NAME OF PROJECT/CONTRACT

CLIENT

SCOPE

DURATION

1

PIPELINE CALL OUT CONTRACT LAND AND SWAMP, 30” x 56KM

WEST AFRICAN GAS PIPELINE (WAPCo0

REPAIRS

CALL OUT CONTRACT

2

PERMANENT OF TEMPORARY CLAMPED GAS PIPELINE

WEST AFRICAN GAS PIPELINE COMPANY (WAPCo)

CLAMPING AND INSPECTION

2 DAYS

3

10 INCHES SPLF TO MFS PIPELINE INSTALLATION

ADVANCE OIL PRODUCTION SYSTEMS LIMITED

PIPELINE INSTALLATION

4 MONTHS

4

PROVISION OF SERVICES

FOR WELDING JOINTS OF

PIPELINE

WORK FROM SLN1 TO

ADAPALM 21KM

ADVANCE OIL PRODUCTION SYSTEMS LIMITED

PIPELINE INSTALLATION

5 MONTHS

5

36 INCHES

PIPELINE(GOLDEN TIE –IN) AT KP 104 OF ELPS II)

ZAKHEM/NIGERIAN GAS COMPANY LTD

TIE IN OF JOINT

ONE MONTH

6

SECTIONAL REPLACEMENT/PATCH WELDING/CLAMPING OF VARIOUS

DIAMETER/SIZE PIPELINE

HERITAGE PETROLEUM COMPANY (ANOTECH IN PATNERSHIP WITH OCEAN MARINE SOLUTION)

PIPELINE MAINTENACE

CALL OUT CONTRACT

(ON-GOING)

7

TRANS.NEMBE PIPELINER REPAIR NONWA PIPELINE SECTIONAL REPLACEMENT

ANASAMI/SHELL PETROLEUM DEV. COMPANY

SECTIONAL REPLACEMENT

FEB – APRIL, 2017

COMPLETED/

COMMISSIONED

8

TIE-IN OF 1 NO. 30” ESCRAVOS EXPORT PIPELINE PROJECT

GRAMEN PETROSERVE/CHEVRON NIG. LTD

CONSTRUCTION AND

EQUIPMENT PROVISION

CALL OUT PROJECT

COMPLETED/COMMISS

IONED

9

CONSTRUCTION OF THE DUAL 10” AND 6” PIPELINE PROJECT FROM

OWA-ALADINMA TO OGHAREFE

FLOWSTATION

PAN OCEAN CORPORATION

CONSTRUCTION

NOV. 2012 – AUGUST,

2018 COMPLETED/COMMISS

IONED

10

ESCRAVOS WELL 10LIMA FLOWLINE (2 NOS. 2.6KM X 4”)

ANASEMI CONSTRUCTION NIG. LTD SHELL PETROLEUM DEV. COMPANY

CONSTRUCTION

AUGUST – NOVEMBER,

2017

COMPLETED/COMMISS

IONED

11

SECTIONAL REPLACEMENT OF 24” ESCRAVOS –WARRI PPMC CRUDE PIPELINE

OCEAN MARINE SERVICES

SECTIONAL REPLACEMENT

CALL OUT CONTRACT

12

CUTTING AND REPLACEMENT 24” , 18” , 14”, 10” & 3” KADUNA REFINING & PETROCHEMICAL

KADUNA REFINING & PETROCHEMICAL COMPANY

CUTTING AND

REPLACEMENT OF PIPES

AUGUST –

SEPTEMBER, 2016 MONTHS

13

PATCH WELD OF TWO LEAK POINTS ON OBEN-SAPELE 18” OBEN – SAPELE GAS PIPELINE AROUND KP 25 OGHARAFE TOWN,

DELTA STATE

NIGERIAN GAS COMPANY EKPANWARRI

REPAIRS (PATECH WELD)

PPMC EMERGENCY PIPELINE PALLIATIVE MEASURE COMPLETED/COMMISSIONED

14

CUTTING AND REPLACEMENT OF 26” KRPC PIPE HEADER WESTERN BATTERY LIMIT IN AREA 3

KADUNA REFINING & PETROCHEMICAL

COMPANY

CUTTING AND REPLACEMENT OF PIPES

SEPTEMBER – DECEMBER, 2015 COMPLETED/COMMISSIONED

15

CALL-OUT CONTRACT FOR INSTALLATION /REPAIRS OF FLOWLINES /PILINES IN CHEVRON

NIG.. LTD. SWAMP LOCATION

CHEVRON NIG. LTD

PIPELINE AND FLOWSTATION REPAIR

CALL OUT CONTRACT

(2015-2015)

COMPLETED/COMMISS

IONED

16

OLERO BULKLINE REPLACEMENT PROJECT – MODIFICATION TO INTER-CONNECTING PIPE-BRIDGE (ICP) AND INSTALLATION OF PIG

TRAPS (RECEIVER, LAUNCHER,

PIPING SPOOLS AND STRUCTURAL

SUPPORT, ON THE NEW OLERO 16”

CHEVRON NIG. LTD

INTER PIPING INSTALLATION / FLOW STATION

CALL OUT CONTRACT

(2015-2015)

OMPLETED/COMMISSI

ONED

17

CONSTRUCTION OF OKPORHURHRU 6” BULKLINE, 4” FLOWLINE, AND

MANIFOLD

SEPLAT PETROLEUM DEV. COMPANY

PIPELINE CONSTRUCTION

JUNE-SEPTEMBER, 2011

COMPLETED/COMMISS

IONED

18

CONSTRUCTION OF DUAL 6”

SCHEDULE 80 X 1.5KM FLOWLINE AT ONA 4/5

PAN OCEAN OIL CORPORATION

CONSTRUCTION OF FLOWSTATION

1MONTH

COMPLETED/COMMISS IONED

19

CONSTRUCTION OF (SECOND

SEGMENT) SINGLE NPS 6 X 3.5 KM SCHEDULE 80 CARBON STEEL FLOWLINES FROM BOUNDARY POST (BP2.5) TO ASABORO-4

LOCATION

PAN OCEAN OIL

CORPORATION

CONSTRUCTIO N OF PIPELINE

1 MONTH

COMPLETED/COMMISS

IONED

20

26” ABITEYE-ESCRAVOS

CHEVRON NIG. LTD

REPAIR OF PIPELINE

COMPLETED/COMMISSI ONED

21

20” X 3.5KM PIPELINE

CONSTRUCTION

SHELL PETROLEUM

DEVELOPMENT COMPANY

CONSTRUCTIO N OF PIPELINE

COMPLETED/COMMISS IONED